Rack and stack services

Rack and stack is the physical installation of server, storage and network hardware into data centre cabinets. A DataOptix engineer receives the shipment, mounts each device to your elevation drawing, connects power and data, labels every cable and verifies the equipment powers on and is reachable. You get photographs and an as-built record before we leave site.

An engineer sliding a rack-mount server onto its rails in a data centre cabinet

What's included

What rack and stack covers

Every engagement is scoped to your site and your build standard. This is what the work typically involves.

  • Delivery acceptance, unboxing and packaging removal
  • Rail kit assembly and mounting to your rack elevation
  • Dual power feeds to A and B PDUs with cable management
  • Copper and fibre patching to your port map
  • Labelling to your naming convention at both ends
  • Power-on verification and remote reachability check
  • Photographs of front, rear and cable routing
  • As-built documentation and asset serial capture

How it works

From request to sign-off

  1. Step 1: Share the build sheet

    Send us the elevation, port map and naming convention. We confirm rack units, power draw and any access requirements before the date.

  2. Step 2: Receive and install

    We accept the delivery at the loading bay, check it against the packing list and install to your drawing. Anything that does not match is flagged before we proceed.

  3. Step 3: Verify and document

    Every device is powered on and confirmed reachable. You receive photographs, serial numbers and an as-built record the same day.

Response

SLA options

Pay as you go carries a 4-hour response SLA. Block-hour customers are dispatched on 2-hour and take priority over ad-hoc requests.

Pay as you go

4-hour response

Occasional, unplanned work with no ongoing commitment

Block hours

Most popular

2-hour response

Regular work, or uptime requirements that need faster response

Project-based

Scoped per project

Migrations, new builds, audits and cabling programmes

Compare the service models in full

Rack and stack questions

Do you need someone from our team on site?

No. Once we have the build sheet and facility access is arranged, our engineer works unaccompanied and reports back with photographs and an as-built record.

Can you accept and store hardware before the install date?

In most facilities yes. We can take delivery, check it against the packing list and hold it in a secure area until the install window. Confirm the arrangement with us when you book, because storage rules vary between operators.

What happens if hardware arrives damaged or incomplete?

We stop, photograph the condition and contact you before installing anything. If the shortfall is a vendor issue we can raise the RMA on your behalf under our RMA and logistics service.

How many racks can you build in a day?

It depends on device density and cabling complexity. As a working figure, one engineer typically completes a full 42U cabinet of standard 1U and 2U servers with structured patching in a day. We confirm a realistic schedule when we see the build sheet.

Need rack and stack?

Tell us the site, the scope and the timescale. A coordinator replies within 2 business hours.